Shoot 1 1 4 inch finish nails through the shoe and into the base trim.
Installing shoe molding on uneven floor.
Lengths of scrap baseboard and put 45 degree angles on the ends.
First hold the base molding against the wall after you cut it to length and look for gaps.
Once your flooring is down install shoe molding to cover the expansion gap between the flooring and the base trim.
Cut the base shoe a quarter round molding that goes at the bottom of the base molding to length and attach it with a finish nailer.
Tool to cut baseboard and shoe molding.
Floor transitions are necessary when installing a new floor in your house.
Be careful not to pin the flooring down in the process.
Nail it at an angle so that the nail goes downward into the wood.
Finish the molding to match the trim not the flooring.
Here are a few options when you have to combine two uneven floors.
The flexibility of the molding makes it easy to do this.
Miter the corners as with the base molding.
If you are beginning with a piece that will fit an outside corner such as around a post or wall arch you can position the piece of molding across the wall and mark the ends of the molding with a pencil at the wall intersection.
Nail the floor trim to the studs and then tack the braces to the trim with 1 in brads.
Where one floor meets another type of flooring you will have to install some sort of transition piece.
You should fasten shoe molding using an 18 gauge finish nailer with 1 inch nails.
Https amzn to 2bbf8fu so maybe you are installing your own floor and left a little bit to much sp.
Then apply construction adhesive at the top and bottom.
Before you install shoe molding sand down your moldings and finish them with a few coats of varnish to match your floor.
16 gauge nails are likely to split shoe molding and will be more easily visible on the small surface.
Insert one finish nail approximately every.
The nails won t hold if they re driven straight into the polystyrene molding.
Amazon links to items used in video ryobi p320 airstrike.
Press shoe molding firmly against the floor and against the baseboard as you nail it in place.
If you see some cut a few braces from 4 to 6 in.
Shoe molding should be tacked to the baseboard not the floor which inhibits floor expansion beneath the shoe molding.
This will help you cover the gap and make it a smoother transition from one floor to the next.